Pipeline insulation and heating

Pipeline insulation and heating

  • Introduction to System Solutions
  • Service Content

1.HEATINGJACKET

HEATINGJACKET英文.png


2.HEATING TAPE

Explanation:

1. Temperature control panel

2. The insulation content includes:

A.Back-Up (G/C to G/C)

B.Main Tube (1~2 POU)

C. VMB supervisor is included in the main system

D. VMB Back Up is included in the main system or Stick content

E,GC R/L Panel

HEATING TAPE.png